How to Use Building Information Modeling (BIM) for More Accurate Construction Estimations

Precise cost valuation is one of the most essential factors that affect the construction project’s success delivery. Overestimating costs can cause budget overruns, whereas underestimating can result in missed chances and failing bids with the industry. Here BIM can take its rightful place with the greatest difference.

What is BIM?

BIM is a digital replica of the concrete estimating services facility combining the physical as they are and the functional representation. This article acts as a collective knowledge resource where you can find everything there is to know about the facility and can thus be a dependable foundation for decisions on how the facility is created and maintained. At the level of its base, it is classified as a smart 3D model-assisted process that would give the architecture, engineering, and building (AEC) professionals valuable insight and tools to all the more really plan, plan, develop, and oversee structures and foundations.

BIM

How Does BIM Enhance Calculation Precision?

1. Complete Project Visualization

Cost estimators, BIM goes further than ordinary 2D drawings and offers a detailed 3D structure of an entire building. It enables estimators to quickly go through the complexities of elevations and components of buildings while still ensuring that systems details and measurements are well established. Avoiding the devastating impacts of take-off errors and identifying omissions can be achieved this way, thereby, minimizing unnecessary things that require guesswork.

2. Automated Quantification

The Building information models contain data of real-world objects. The software can provide professional quantification of materials and hours by itself until reaching information about materials and labor required from the model. This automates the calculations, hence, reducing the laborious processes, saving time, and using the same functionality.

3. Clash Detection

The detection of clashes in BIM makes it possible to identify collisions such as the installation of ductwork colliding with the structural members. it reveals defects no one has spotted to avoid during the construction phase. This ensures that the work is performed right the first time with minimal corrective actions as typically this causes cost overruns.

4. What-if Scenarios

Charging for this modification could be delivered at a significant cost in time. However, the BIM’s parametric modelling feature facilitates the reshaping of model elements with great ease. Estimators can quickly run various “what-if” scenarios to offer a more diverse pricing selection to each owner.

5. Lifecycle Cost Analysis

BIM provides, among other essential information, data about preliminary estimating services components that enable a more detailed life-cycle cost analysis. In other words, estimators will have the capability to figure out costs of both, the operational costs, and the construction costs early, which will be vital to the proper planning of the capital resources for the owners.

BIM

BIM Process for Estimation

Although BIM promotes the predictability of cost estimation, strategic vision is essential for the process to become more efficient. Below are steps to integrate BIM into estimation: Below are steps to integrate BIM into estimation:

  • Develop BIM Execution Plan: Build a structure containing the description of BIM use during the project, the level of detail, file formats, and the duties of the parties involved.
  • Create Information-rich Models: Model the real-world intelligent actions for architectural, structural, MEP (mechanical, electrical, and plumbing) and all other disciplines. The Constructability shall now be looked into.
  • Perform Clash Detection: Join models between disciplines to solve the hard clashes (tectonic conflicts), and soft clashes (contestability issues).
  • Import to Estimation Software: Also, harmonize the BIM model with the estimating system. Verify the category to which model objects shall be associated so that their representation in the cost database is correct.
  • Extract Quantities: Employ computerized measurement tools to pull the content of material, equipment, and labor quantities from BIM models right into the estimation forms.
  • Integrate Rate Data: Take labor/material rates from the enterprise cost database, and put quantities into a standardized form. The number of systems that feature personal databases is also increasing.
  • Analyze Scenarios: Analyze an array of options and estimate the cost using the what-if tool which helps to identify potential decisions.
  • Generate Reports: Prepare comprehensive reports on the materials, specifications, volumes, and rates based on the different option scenarios. That will become the basis for contractors’ bids.
BIM

Conclusion

The apprehension of BIM integration enables the initial cooperation of the project participants. Despite BIM being the factor that causes strategic planning, the lifecycle savings and profitability of projects that are enjoyed as a result are very worthwhile indeed. For construction companies, to be able to accurately estimate costs is a must for survival. By building on BIM’s 3D visualization, clash detection, automatic quantification, and what-if options, we achieve the highest level of estimation precision, which is not achievable with traditional methods.

Leave a Comment